From Permit to Punch List: A Complete Ground-Up Build Timeline for 2025
Building from the ground up is an exciting journey, but a realistic timeline is crucial for success. This guide breaks down every phase for custom homes and commercial projects in Southern California, Arizona, and Utah.
Plan Your Project with Confidence
Get a detailed timeline and accurate cost estimate for your specific ground-up construction project. Our experts will help you navigate every phase.
Timeline Overview: Residential vs. Commercial
Typical Ground-Up Build Timelines for 2025
Custom Home (2,500 sq ft)
8-14 months total
Commercial Space (5,000 sq ft)
10-18 months total
These timelines are estimates. For a detailed cost breakdown, see our guide on how much it costs to build a custom home in 2025.
Phase-by-Phase Construction Breakdown
Design, engineering, and permitting. The most critical phase for budget and timeline success.
Surveying, excavation, grading, and utility trenching.
Pouring footings and foundation walls to create a solid base.
Framing, roofing, windows, and MEP (Mechanical, Electrical, Plumbing) rough-in.
Closing up the walls and preparing for interior finishes.
Flooring, paint, cabinets, countertops, and fixtures.
MEP finals, exterior siding, and hardscaping.
Punch list, final walkthrough, and receiving the Certificate of Occupancy.
How Location Impacts Your Timeline
Permitting and labor availability vary significantly by location. Here’s a quick overview:
Los Angeles & Orange County
Expect longer permit times (add 2-4 weeks) due to complex regulations, especially in coastal zones. High demand for skilled labor means booking contractors well in advance is crucial. Learn more about our services as a general contractor in Los Angeles.
San Diego County
Generally balanced timelines with year-round construction weather. Coastal Commission can add time to projects near the water. See our expertise as a general contractor in San Diego.
Arizona & Utah
Faster permitting but be mindful of seasonal weather. Extreme summer heat in Phoenix or winter snow in Flagstaff can impact schedules.
How to Keep Your Project On Schedule
- Finalize Designs Early: Avoid change orders, which are a primary cause of delays and cost overruns.
- Hire an Experienced Local Contractor: They understand local permit processes and have established relationships with inspectors.
- Order Long-Lead Items Early: Custom windows, doors, and specialty fixtures should be ordered during the permit phase.
- Budget for Contingencies: A 15-20% buffer in both your timeline and budget is essential.
For more tips, read our guide on the top 5 questions to ask any contractor.