Commercial Case Study

Ground-Up Commercial Build: Starbucks Yucca Valley

Troy Construction Design was selected as the general contractor for the new Starbucks location in Yucca Valley, California. This ground-up commercial project demonstrates our capability to deliver complex builds that meet global brand standards while navigating High Desert permitting and site conditions.

Project Overview

Project Details

Project Type

Ground-Up Commercial Construction

Client

Starbucks Corporation

Timeline

8 months (Permitting + Construction)

Contractor License

CSLB #1080116

Location

Yucca Valley, California
San Bernardino County
High Desert Region

This project marks Starbucks' expansion into the Morongo Basin, serving Yucca Valley, Joshua Tree, and Twentynine Palms communities.

Starbucks Yucca Valley - Exterior Photo

High-quality project photo coming soon

Scope of Work

Troy Construction Design managed all phases of construction from initial site work through final finishes and punch list. Our team coordinated multiple trades, maintained strict quality control, and delivered on schedule to meet Starbucks corporate standards.

1

Site Preparation & Demolition

  • • Site clearance and vegetation removal
  • • Existing structure demolition
  • • Environmental compliance documentation
  • • Temporary fencing and site security
2

Grading & Earthwork

  • • Site grading and drainage planning
  • • Compacted subbase preparation
  • • Stormwater management systems
  • • Parking lot grading and slopes
3

Foundation & Concrete

  • • Slab-on-grade foundation system
  • • Reinforced concrete footings
  • • Vapor barrier installation
  • • Concrete walkways and curbs
4

Utility Connections

  • • Municipal water service connection
  • • Sewer and plumbing rough-in
  • • Electrical service and transformer
  • • Gas line installation
5

Framing & Structure

  • • Steel framing and structural support
  • • Roof trusses and decking
  • • Exterior wall sheathing
  • • Window and door openings
6

MEP Systems

  • • HVAC system installation
  • • Electrical rough-in and panels
  • • Plumbing fixtures and finishes
  • • Fire suppression and safety systems
7

Exterior Finishes

  • • Stucco and exterior cladding
  • • Commercial roofing system
  • • Storefront glass and entry doors
  • • Exterior lighting and signage prep
8

Interior Finishes

  • • Drywall installation and finishing
  • • Commercial flooring (tile, vinyl)
  • • Interior paint and trim
  • • Millwork and fixtures installation
9

Specialty Systems

  • • Commercial kitchen equipment
  • • Drive-thru window and ordering system
  • • Point-of-sale technology prep
  • • WiFi and networking infrastructure
10

Site Improvements

  • • Parking lot paving and striping
  • • Landscaping and irrigation
  • • Exterior lighting installation
  • • Trash enclosure and utilities screening

Project Timeline

Months 1-2

Permitting & Pre-Construction

Coordinated with San Bernardino County Planning Department for building permits, site plan approval, and utility connections. Completed soil testing, survey work, and final engineering drawings.

Months 3-4

Site Work & Foundation

Completed site demolition, grading, and utility rough-ins. Poured concrete foundation and slab. Installed underground plumbing, electrical conduit, and drainage systems.

Months 5-6

Building Structure

Erected steel framing, installed roof system, and completed exterior envelope. Installed windows, doors, and storefront glass. MEP rough-ins for HVAC, electrical, and plumbing.

Months 7-8

Interior Finishes & Site Work

Completed drywall, flooring, painting, and millwork. Installed kitchen equipment, fixtures, and finishes. Paved parking lot, completed landscaping, and installed exterior lighting. Final inspections and punch list completion.

Completion

Certificate of Occupancy & Opening

Received Certificate of Occupancy from San Bernardino County. Completed final walk-through with Starbucks corporate team. Project delivered on time and within budget, ready for grand opening.

Challenges & Solutions

Challenge: Desert Climate Conditions

Yucca Valley's extreme temperature swings (100°F+ summers, freezing winters) and high winds required specialized construction approaches.

Solution:

Specified high-efficiency HVAC systems rated for extreme temperatures. Used UV-resistant materials for exterior finishes. Scheduled concrete pours during optimal temperature windows to ensure proper curing.

Challenge: Strict Corporate Standards

Starbucks requires precise adherence to corporate design standards, brand specifications, and quality control protocols.

Solution:

Maintained constant communication with Starbucks project managers. Implemented rigorous quality control inspections at each phase. Used approved vendors and materials lists to ensure brand consistency.

Challenge: San Bernardino County Permits

Complex permitting requirements for commercial food service facilities including health department, fire marshal, and building department approvals.

Solution:

Leveraged our deep experience with local permitting processes. Submitted complete, accurate plans on first submission. Coordinated multi-department inspections efficiently to avoid delays.

Challenge: Utility Coordination

Commercial coffee shop requires substantial electrical service, water capacity, and waste management systems not standard in the High Desert.

Solution:

Coordinated with local utility providers months in advance. Upgraded electrical service and installed commercial-grade water filtration. Designed grease trap and drainage systems to exceed code requirements.

Local Economic Impact

The new Starbucks location represents significant economic growth for Yucca Valley and the broader Morongo Basin community. Troy Construction Design is proud to contribute to this development.

Job Creation

The new Starbucks location created 15-20 permanent jobs for Yucca Valley residents, plus construction employment during the build phase.

Local Economy

Attracts visitors and provides gathering space for residents. Increases property values and demonstrates corporate confidence in High Desert growth.

Development Catalyst

Major brand presence encourages additional commercial development. Signals Yucca Valley's emergence as a vibrant desert community.

Why Starbucks Chose Troy Construction Design

Proven Commercial Experience

Extensive portfolio of commercial builds including retail, office, and food service facilities across Southern California and Arizona.

Local Market Knowledge

Permanent Yucca Valley office with intimate understanding of San Bernardino County permitting, desert building requirements, and local subcontractor networks.

Quality Control Systems

Rigorous multi-phase inspection protocols ensure work meets or exceeds corporate standards at every stage of construction.

On-Time, On-Budget Delivery

Track record of completing complex commercial projects on schedule and within budget through proactive project management and problem-solving.

Licensed & Insured

CSLB License #1080116 with full bonding and insurance coverage. Bondable for projects up to $10M+.

Dedicated Project Management

Single point of contact with daily site presence ensuring responsive communication and rapid issue resolution.

Ready to Start Your Commercial Construction Project?

From ground-up builds to tenant improvements, Troy Construction Design delivers commercial-grade quality on time and within budget.